Honduras Bridge

SITE NAVIGATION

Home

Background

Pre-Design

Design

Closing Assessments

Implementation

Honduras Bridge

Welcome to our site!  You can check out different parts of our project by clicking through the Site Navigation at the top of each page, as well as the Resources at the bottom of this page. Background is a great place to start!

Our Mission

We set out to connect twelve communities to a medical clinic in Bacadillas, Honduras with a bridge that is durable, sustainable, cost effective, feasible, easily constructible, and beneficial to the community.

Our Team

Contact Info

  • Will Hellman: william.h.hellman@vanderbilt.edu
  • Caroline Janssen: caroline.o.janssen@vanderbilt.edu
  • Miranda Mangahas: miranda.mangahas@vanderbilt.edu
  • Nathan Miller: nathan.miller@vanderbilt.edu
  • Cole Siegenfeld: cole.siegenfeld@vanderbilt.edu

Special Thanks

  • Mentors: John Hastings and Scott Wilson
  • Sponsor: Predisan Health Ministries
  • Dr. Lori Troxel and Bowen He
  • Vanderbilt Civil Engineering Department
  • Lipscomb Civil Engineering Department
  • Dr. LeBoeuf and Dr. Byers

SITE NAVIGATION

Home

Background

Pre-Design

Design

Closing Assessments

Implementation

RESOURCES

Final Report

Video Presentation

PowerPoint Slides

Continue to Next Page

Recent Posts